At the “Sachsenfalle” intersection (B189/B190), a bypass is being built for future heavy-haul transports heading to the Fleetmark wind farm, to be used as needed.
The measure will be in effect from October 8, 2026, through February 28, 2027.
At the “Sachsenfalle” intersection (B189/B190), a bypass is being built for future heavy-haul transports heading to the Fleetmark wind farm, to be used as needed.
The measure will be in effect from October 8, 2026, through February 28, 2027.